Drone imagery of the ongoing works at Bethel Church, in Newport. Almost 3 years to the date of the fire, the majority of the 63 tons of steel required to hold the structure is in now in place. This Exemplar2020 project is progressing swiftly.
Good progress on getting the Atrium floor cast. Following on from completion of the pumped concrete pours of the basement, ground, first and mezzanine floors that are all in place below.
Tower crane maintenance and checks for the Safe Crane Campaign are occurring during the filming. A job that takes a good head for heights.
The damaged Zanzibar club to the North of the site is clearly visible.